PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing Sprinkler main raiser at the 4th floor Facing North-East.jpg Interior metal framing at the 4th floor Facing West.jpg Metal studs at the 2nd floor Facing West.jpg Stair -3 at the 3rd floor Facing North.jpg Welding Stair -1 stairs Facing South.jpg Block work at the lower Facing North.jpg Installing the curtain wall mullions at the South Elevation.jpg
Previous pageNext page Welding Stair -1 stairs Facing South
Welding Stair -1 stairs Facing South